Short Answer
Key Formula / Key Facts Box
Governing relationship: TDH(Q) = Hst + hf(Q) + hm(Q) + Δhv
Hazen-Williams friction, full pipe: hf = 10.67 L Q1.852 / (C1.852 D4.870) in SI with Q in m³/s and D in m; hf = 4.727 L Q1.852 / (C1.852 D4.870) in US customary with Q in ft³/s and D in ft.
| Symbol | Meaning | US unit | SI unit | Plain-English role |
|---|---|---|---|---|
| TDH | Total dynamic head | ft | m | Head the pump must supply at a given flow |
| Hst | Static head | ft | m | Fixed lift from wet-well water surface to discharge |
| hf | Pipe friction loss | ft | m | Energy lost to pipe-wall friction |
| hm | Minor losses | ft | m | Losses through valves, fittings, bends, and exits |
| Δhv | Velocity-head difference | ft | m | Usually small; may be folded into exit loss |
| Q | Flow rate | ft³/s (cfs) | m³/s | Flow at which the curve is evaluated |
| L | Force-main length | ft | m | Length of pipe carrying pumped wastewater |
| C | Hazen-Williams roughness coefficient | dimensionless | dimensionless | Smoothness: lower for old or rough pipe |
| D | Internal pipe diameter | ft | m | Actual inside diameter, not nominal pipe size |
Plain-English restatement: for each flow, add the fixed lift to the flow-dependent friction and fitting losses; the sum is the system head the pump must overcome. If flow is entered in gpm and diameter in inches, use hf = 10.44 L Q1.852 / (C1.852 D4.8655) with consistent US units.
Overview — What It Is and Why It Matters
In this article, a system curve for a sewage force main means the steady-state relationship between pumped flow rate and the total dynamic head required by the force main and its appurtenances, starting at the wet-well water surface and ending at the discharge point. It is not a transient surge analysis, a pump curve, or a detailed rheological model of raw sludge; those are separate evaluations that may be layered onto the same design.
Physically, the curve answers a simple question: if the pump delivers this much flow, how much head must it produce to push sewage through this pipe, lift it to the discharge elevation, and pass valves and fittings? At zero flow, the system requires only static lift plus any pressure difference. As flow increases, friction and minor losses rise rapidly, so the system curve bends upward. Its steepness is controlled mainly by pipe length, internal diameter, roughness, and the number and type of fittings.
Building the curve is central to pump selection for a lift station. The intersection of the system curve and the installed pump curve is the operating point. If the curve is underestimated, the selected pump may run far out on its curve, overload the motor, or fail to meet peak flow. If it is overestimated, the pump may operate at low efficiency, waste energy, or run near shutoff where solids and heat can create problems. For sewage force mains, errors also affect scouring velocity, odor and corrosion risk, wet-well cycling, and overflow reliability.
The Method — Derivation and Variants
The energy equation between the wet-well water surface and the discharge point gives the framework. With the upstream surface velocity and gage pressure taken as approximately zero, and with a free discharge at atmospheric pressure, the required head becomes:
TDH = (Zd – Zw) + hf + hm + (Vd2 – Vw2)/(2g) + (Pd – Pw)/γ
For a typical municipal force main discharging to a gravity manhole, the pressure term is often zero and the upstream velocity is negligible. The static term Hst = Zd – Zw should be evaluated at the wet-well operating levels that matter: low water, high water, and alarm or standby levels. Many stations therefore need a family of system curves rather than a single line.
Friction can be calculated with Darcy-Weisbach as hf = f(L/D)(V2/2g) or, more commonly in wastewater force-main preliminary design, with the empirical Hazen-Williams equation. Minor losses are hm = ΣK(V2/2g), where ΣK sums valves, bends, tees, check valves, and exit losses. For a circular pipe, V = 4Q/(πD2), so both friction and minor losses plot approximately as functions of Q1.852 and Q2, respectively. That is why a practical system curve is often written as H(Q) ≈ Hst + KsysQ2 or Hst + KHWQ1.852.
| Term | US customary form | SI form |
|---|---|---|
| Hazen-Williams pipe friction | hf = 4.727 L Q1.852 / (C1.852 D4.870), Q in cfs, D in ft | hf = 10.67 L Q1.852 / (C1.852 D4.870), Q in m³/s, D in m |
| Minor losses | hm = ΣK V2/(2g), g = 32.2 ft/s² | hm = ΣK V2/(2g), g = 9.81 m/s² |
| System curve shape | H = Hst + friction(Q) + minor(Q) | Same relationship with consistent SI units |
The constants are unit-conversion artifacts; they must not be mixed. Use the US form with cubic feet per second and feet, or the gpm-and-inches variant carefully. Use the SI form with cubic metres per second and metres. Hazen-Williams is well suited to water-like municipal wastewater at ordinary temperatures and is widely accepted for force-main planning, but it is empirical. Darcy-Weisbach is preferred when viscosity, detailed roughness, or unusual fluids matter, or when a higher-fidelity model is required. In either case, the system curve is built by evaluating several flows from zero to at least 125 percent of design flow, summing heads, and plotting the points.
Worked Example
US customary example. A lift station has a wet-well low-water elevation of 100.0 ft and a force-main discharge water surface at 135.0 ft, so Hst = 35.0 ft. The force main is 2,000 ft long, 8 in internal diameter, with Hazen-Williams C = 120. Design flow is 800 gpm, and the summed minor-loss coefficient is ΣK = 8. Using the gpm and inch form: hf = 10.44 × 2,000 × 8001.852 / (1201.852 × 84.8655) ≈ 28.4 ft. Velocity is V = Q/A = (800 gpm × 0.002228 ft³/s per gpm)/(0.349 ft²) ≈ 5.10 ft/s, so V2/(2g) ≈ 0.404 ft and hm = 8 × 0.404 ≈ 3.2 ft. Therefore TDH ≈ 35.0 + 28.4 + 3.2 = 66.6 ft, or about 67 ft at 800 gpm. At 400 gpm, friction scales by (400/800)1.852 ≈ 0.277, giving about 7.9 ft, and minor loss scales by (400/800)2 = 0.25, giving about 0.8 ft; the system requires about 43.7 ft. At zero flow the curve starts at about 35 ft.
SI example. A station has Hst = 12.0 m, a 600 m long force main with 200 mm internal diameter, C = 120, design flow 50 L/s = 0.050 m³/s, and ΣK = 8. Using hf = 10.67 L Q1.852/(C1.852 D4.870), the result is approximately 8.9 m. Velocity is 0.050/(π × 0.100²) ≈ 1.59 m/s, so V2/(2g) ≈ 0.129 m and minor loss is about 1.03 m. Thus TDH ≈ 12.0 + 8.9 + 1.0 = 21.9 m, or about 22 m at 50 L/s. At 25 L/s, friction falls to about 2.5 m and minor loss to about 0.26 m, giving roughly 14.8 m. These points are plotted with flow on the horizontal axis and head on the vertical axis; the smooth curve through them is the system curve.
Calculator
For a quick check of the head sum before plotting, use the online total dynamic head calculator at pumpcalcs.com/calculators/total-dynamic-head/. Enter static head, flow, pipe length and diameter, roughness assumptions, and minor-loss coefficient, then verify that the calculator uses the same unit system as the source data. A spreadsheet should still be used to generate the full curve at multiple flows.
Reference Values & Typical Ranges
| Parameter | Typical value or range | Practical note and source basis |
|---|---|---|
| Force-main velocity | About 2 to 6 ft/s normal design range; minimum about 3.5 ft/s at peak for many small stations; maximum about 10 ft/s | Oregon DEQ guidance calls for roughly 4 to 6 ft/s to scour grit and 3.5 ft/s minimum; UFC 3-240-06A limits maximum to about 3 m/s (10 ft/s). |
| Solids resuspension velocity | 0.75 to 1.0 m/s (2.5 to 3.5 ft/s) once or twice daily | UFC 3-240-06A notes solids settle below about 0.3 m/s (1 ft/s) and recommends periodic scouring velocities. |
| Hazen-Williams C | Old pipe about 100 to 120; new pipe about 140 to 150; design values commonly capped near 140 | UFC 3-240-06A and Oregon DEQ guidance both recommend checking old and new conditions; do not design only for a clean new pipe. |
| Pump best operating point efficiency | Often expected above 50 percent for municipal wastewater pumps | PDH-Pro lift-station course notes many municipalities require BOP efficiency above 50 percent. |
| Two pumps in parallel | Combined flow often about 1.4Q to 1.75Q, not 2Q, depending on system-curve slope | PDH-Pro course material emphasizes that the system curve determines the actual parallel gain. |
| Wet-well operating band | Typically several feet or about 1 to 2 m between pump-off, lead-on, and lag-on levels | Static head changes across this band; plot high- and low-level curves. |
- Use internal diameter, not nominal pipe size, for Hazen-Williams or Darcy-Weisbach calculations.
- Check both new-pipe and aged-pipe C factors; a conservative design curve often uses C near 100 to 120 for old force mains.
- Evaluate the system at minimum, average, peak, and emergency flows. Sewage pump stations may operate over a wide range, especially where VFDs or parallel pumps are used.
- Include an appropriate design margin for unknown future flows, grease, grit, and air binding, but keep the margin visible and separately stated.
Application Guidance
In real lift stations, the system curve is a decision tool, not a one-time calculation. The static head changes as the wet well fills and empties, and the downstream discharge water level may also vary. Plot at least a low-water and high-water curve. Then overlay the pump curve, or the family of pump curves for lead, lag, and parallel operation. The operating point should be stable, should avoid extreme runout, and should keep the pump away from chronic shutoff operation. Variable-frequency drives shift the pump curve, but they do not change the system curve; they simply move the intersection.
Pipe aging is a major field adjustment. A force main that was designed with C = 140 may behave more like C = 100 after years of biofilm, grease, corrosion products, and tuberculation. For existing stations, field head and flow measurements are valuable: record pump discharge pressure, wet-well level, and flow at several stable conditions, then back-calculate the effective C or friction factor. If the measured curve lies above the predicted curve, check for closed valves, debris, air pockets, clogged impellers, or a partially blocked force main before assuming the pump has failed.
Selection implications are direct. A steep system curve favors a higher-head pump and may justify a larger force main if lifecycle energy costs are high. A flat system curve means parallel pumps can add substantial flow, but the motors must be sized for single-pump runout. At low flows, verify that the force main still reaches scouring velocity at least periodically, or provide a flushing program. High points need air-release valves, and all force mains need transient checks for water hammer and surge, because the steady system curve does not by itself ensure safe pressure limits.
Common Mistakes, Limits & Safety Notes
- Using pump discharge pressure as static head. Static head is the elevation and pressure difference between the wet-well surface and the discharge point, not the pump gage reading alone.
- Forgetting wet-well level variation. A curve built only at high water can mislead the selection; low-water shutoff and lead-on conditions matter.
- Mixing unit systems. Do not put gpm into a cfs Hazen-Williams constant, inches into a feet-based formula, or kPa into a head equation without conversion.
- Using nominal diameter. Hazen-Williams and Darcy-Weisbach require internal diameter; cement-lined, plastic, and metal pipes have different inside dimensions.
- Ignoring minor losses. Check valves, plug valves, bends, tees, and exit losses can be significant in short force mains and at high velocity.
- Designing only for a new pipe. Old force mains may have C values near 100 or lower; a curve based on C = 150 may underpredict head and overload the pump.
- Treating Hazen-Williams as universal. It is empirical and intended mainly for water-like fluids; it is not a detailed model for slurries, severe grease, or non-Newtonian sludges.
- Confusing system and pump curves. The system curve depends on piping and elevations; the pump curve depends on the machine and speed. Only their intersection is an operating point.
- Neglecting air and transient effects. Trapped air can create false head, and surge can exceed steady pressures. Air valves, surge analysis, and pipe pressure ratings are separate safety requirements.
- Ignoring safety consequences. Sewage pump stations are confined spaces with hazardous gases, pathogens, electrical hazards, and overflow risk. Field measurements must follow confined-space, lockout/tagout, and wastewater exposure procedures.
FAQ
How do you build a system curve for a sewage force main?
Select several flow rates, calculate static head from wet-well and discharge levels, calculate Hazen-Williams pipe friction and minor losses at each flow, and add them to get total dynamic head. Plot flow on the horizontal axis and head on the vertical axis, then draw a smooth curve through the points. Include high and low wet-well levels if static head varies.
Why does a system curve start above zero at shutoff?
At zero flow there is no friction loss, but the pump still has to overcome the static elevation difference and any pressure difference between the wet well and discharge point. That fixed head is the curve intercept. For a force main discharging to atmosphere, the intercept is essentially the static lift between water surfaces.
What Hazen-Williams C factor should I use for a force main?
Common design values are about 100 to 120 for older, rougher force mains and about 140 to 150 for new pipe. Many municipal reviews require checking both old and new conditions, and some cap design C near 140 to preserve margin. For existing systems, field flow and pressure tests are the best way to confirm the effective C.
How do I include valves and fittings in the system curve?
Use minor-loss coefficients K for each valve, bend, tee, check valve, entrance, and exit, then sum them. Calculate h_m = sum K times velocity head V squared over 2g at each flow. Alternatively, convert fittings to equivalent pipe length and add that length to the force-main length in the friction calculation.
Does wet-well level change the system curve?
Yes. Static head is measured from the wet-well water surface to the discharge point, so a lower wet-well level increases the required lift. A complete design should plot curves for low-water, high-water, and alarm conditions. The pump operating point moves along its curve as the wet well fills and empties.
How do multiple pumps in parallel affect the operating point?
Parallel pumps share the same discharge head and add flow at that head. Because the system curve steepens with flow, two identical pumps usually deliver less than twice single-pump flow, often about 1.4Q to 1.75Q. Overlay combined pump curves on the system curve and check motor sizing for single-pump runout.
What velocity should a sewage force main have?
A common target is about 2 to 6 ft/s, with roughly 3.5 ft/s minimum at peak flow for many small stations and periodic scouring near 2.5 to 3.5 ft/s. Maximum velocity is often limited to about 10 ft/s to control friction, wear, and surge. Confirm local design criteria and solids characteristics.
Can a system curve predict clogging or air binding?
Not directly. The standard steady system curve assumes a clean, water-filled pipe. Clogging, grease, grit, and trapped air raise actual head above the predicted curve. Field measurements that show increasing head at the same flow can indicate a developing blockage or air pocket, so use the curve as a baseline and investigate deviations.
Should I use Hazen-Williams or Darcy-Weisbach for wastewater?
Hazen-Williams is widely used for municipal water and wastewater force-main planning because it is simple and familiar. Darcy-Weisbach is more fundamental and is better when viscosity, detailed roughness, or unusual fluids matter. For raw sewage with heavy solids or grease, either method is only an approximation and should be supported by experience, field data, and design margin.

Leave a Reply